A full-home renovation is not a collection of single-room remodels. Walls move, floors open, mechanical systems are replaced or extended, and every trade depends on the one before it. Get the sequence wrong and the house stays a site for months longer than it should.
We hold the schedule ourselves: structural and rough-in first, then the wet areas, then the finishes. Electrical is filed with the ESA under our own Master Electrician’s licence. One crew from demolition to clean means the person who set the walls is still answerable when the last piece of trim goes on.
In an older house we usually find something that changes the plan. A beam that was never adequate, aluminium wiring, a foundation that needs attention before the addition can land. You hear about it the same day, with a price and an adjusted date, before we proceed.
And you see the house before we build it: drawn, phased, and on most projects walked through in the simulator, so a wall or a window is still cheap to move.