Painting and lighting are often treated as the last, cheapest items on a remodel. Done properly they are the opposite: the lighting is drawn with the room, not added as evenly spaced holes, and the paint goes on only after the walls are actually ready for it.
We lay out the lighting plan ourselves — pot lights, switches, dimming, under-cabinet or niche lighting where it belongs — and the electrical is filed with the ESA under our own Master Electrician’s licence. The paint crew follows only after holes are filled, cracks are taped and the surfaces are sanded and primed where they need to be.
In an older house we usually find walls that have been painted over problems for years. Hairline cracks, poorly patched holes, moisture marks. You hear about what needs real attention before we open the cans, with a price, so the finish does not fail six months later.
And you see the plan before we start: the lighting laid out on the drawings, the paint colours confirmed in the actual light of the room. That is where a switch or a colour is still cheap to change.